State evaluation method of existing segmental precast concrete bridges

  • YUAN Aimin ,
  • CHEN Qi ,
  • MIAO Xinge ,
  • WANG Xi ,
  • HOU Da
Expand
  • College of Civil and Transportation Engineering, Hohai University, Nanjing 210098, China

Received date: 2023-09-13

  Online published: 2024-04-10

Abstract

Based on the research of domestic and foreign scholars on the state evaluation method of existing bridges, the state evaluation index system of existing segmental precast bridge structure is established. The condition assessment standard of existing segmental precast bridge based on analytic hierarchy process method is proposed. According to the principle of analytic hierarchy process method, the weight assignment method is introduced to consider the importance of each factor to evaluate the damage condition of the existing damaged segmental beam, so as to form a new set of state evaluation methods for the existing segmental precast bridge. Finally, an example of damage condition assessment of an existing segmental precast bridge is used to demonstrate the implementation of the proposed method for segmental beam.

Cite this article

YUAN Aimin , CHEN Qi , MIAO Xinge , WANG Xi , HOU Da . State evaluation method of existing segmental precast concrete bridges[J]. Journal of Hebei University(Natural Science Edition), 2024 , 44(2) : 131 -138 . DOI: 10.3969/j.issn.1000-1565.2024.02.003

References

[1] 袁爱民,董华能,周元华,等.节段预制箱梁体外束极限应力增量计算方法[J].中国科技论文, 2016, 11(1): 1-6. DOI: 10.3969/j.issn.2095-2783.2016.01.001.
[2] 刘胜春.光纤光栅智能材料与桥梁健康监测系统研究[D].武汉: 武汉理工大学, 2006.
[3] 岳青,朱利明.东海大桥健康监测系统桥梁健康状态评估方法[J].桥梁建设, 2006, 36(S2): 166-170. DOI: 10.3969/j.issn.1003-4722.2006.z2.045.
[4] 卢朝辉,闵欢,余志武.既有铁路桥梁状态评估指标体系和方法研究[J].铁道科学与工程学报, 2015, 12(5): 1103-1110. DOI: 10.19713/j.cnki.43-1423/u.2015.05.018.
[5] 杨帆.铁路桥梁地震灾害损失评估技术研究[D].石家庄: 石家庄铁道学院, 2010.
[6] TARIGHAT A, MIYAMOTO A. Fuzzy concrete bridge deck condition rating method for practical bridge management system[J]. Expert Syst Appl, 2009, 36(10): 12077-12085. DOI: 10.1016/j.eswa.2009.04.043.
[7] 黄侨,唐海红,任远.基于模糊理论的大跨度桥梁评估理论研究[J].公路交通科技, 2010, 27(1): 62-66. DOI: 10.3969/j.issn.1002-0268.2010.01.013.
[8] 张国庆.基于动态模糊神经网络的桥梁构件维护周期决策系统研究[D].成都: 西南交通大学, 2021.
[9] 何春梅.模糊神经网络的性能及其学习算法研究[D].南京: 南京理工大学, 2010.
[10] 魏召兰.高速铁路大型桥梁结构健康监测与状态评估研究[D].成都: 西南交通大学, 2012.
[11] 贾玲,黄丽华,刘雪飞,等.基于模糊理论和组合权重的光伏组件健康状况评估[J].河北大学学报(自然科学版), 2020, 40(1): 95-103. DOI: 10.3969/j.issn.1000-1565.2020.01.014.
[12] YUAN A M, YANG D, MIAO X G. Strand debonding for prestressed concrete girders to control end horizontal web cracks based on a modified G-S model[J]. J Bridge Eng, 2022, 27(2): 04021109. DOI: 10.1061/(ASCE)BE.1943-5592.0001819.
[13] International Federation for Structural Concrete. Fib bulletins 55-56: Model code 2010 first complete draft[S]. Switzerland: fib Bulletin Lausanne, 2010. (
Outlines

/

〈 〉