[1] 陶莎, 盛昭瀚, 朱建波. 交互作用不确定下的项目组合选择鲁棒决策[J]. 中国管理科学, 2017(4):190-196. TAO S, SHENG Z H, ZHU J B. Robust decision-making of project portfolio selection with uncertain in project interactions[J].Chinese Journal of Management Science, 2017(4):190-196. DOI:10.16381/j.cnki.issn1003-207x.2017.04.023. [2] SEFAIR J A, MENDEZ C Y, BABAT O, et al. Linear solution schemes for mean-semivariance project portfolio selection problems: An application in the oil and gas industry[J]. Omega, 2016, 68: 39-48. DOI:10.1016/j.cie.2015.11.018. [3] 韩燕萍. 创新型企业人才培养的风险管理机制[J]. 科技管理研究, 2016, 36(17):153-157. HAN Y P. The risk management mechanism of talents training in innovative enterprises[J]. Science and Technology Management Research, 2016, 36(17):153-157. DOI:10.3969/j.issn.1000-7695.2016.17.027. [4] LIU Y, LIU Y K. Distributionally robust fuzzy project portfolio optimization problem with interactive returns[J]. Applied Soft Computing, 2017, 56: 655-668. DOI:10.1016/j.asoc.2016.09.022. [5] 王勇胜, 姜利赢, 冷亚军. 考虑多技能人的企业项目组合选择优化研究[J]. 计算机工程与应用, 2012, 48(23):244-248. WANG Y S, JIANG L Y, LENG Y J. Optimization research of enterprise project portfolio selection with considering multi-skilled workforce[J]. Computer Engineering and Applications, 2012, 48(23):244-248. DOI:10.3778/j.issn.1002-8331.2012.23.053. [6] NGWENYAMA O, GUERGACHI A, MCLAREN T. Using the learning curve to maximize IT productivity: A decision analysis model for timing software upgrades[J]. International Journal of Production Economics, 2007, 105(2):524-535. DOI:10.1016/j.ijpe.2006.02.013. [7] GUTJAHR W J, KATZENSTEINER S, REITER P, et al. Competence-driven project portfolio selection, scheduling and staff assignment[J]. Central European Journal of Operations Research, 2008, 16(3): 281-306. DOI:10.1007/s10100-008-0057-z. [8] GUTJAHR W J, REITER P. Bi-objective project portfolio selection and staff assignment under uncertainty[J]. Optimization, 2010, 59(3): 417-445. DOI:10.1080/02331931003700699. [9] GUTJAHR W J, FROESCHL K A. Project portfolio selection under uncertainty with outsourcing opportunities[J]. Flexible Services & Manufacturing Journal, 2013, 25(1-2):255-281. DOI:10.1007/s10696-011-9107-2. [10] HALL N G, LONG D Z, QI J, et al. Managing Underperformance Risk in Project Portfolio Selection[J]. Operations Research, 2015, 63: 660-675. DOI:10.1287/opre.2015.1382. [11] LIU Z Q, LIU Y K. Type-2 fuzzy variables and their arithmetic[J]. Soft Computing, 2010, 14(7):729-747. DOI:10.1007/s00500-009-0461-x. [12] LIU Y K, ZHU X. Capacitated fuzzy two-stage location-allocation problem[J]. International Journal of Innovative Computing Information & Control, 2007, 3(4): 987-999. [13] LIU Y K, GAO J. The independence of fuzzy variables with applications to fuzzy random optimization[J]. International Journal of Uncertainty, Fuzziness & Knowledge-Based Systems, 2007, 15(2): 1-20. [14] LIU Y, LIU Y K. The lambda selections of parametric interval-valued fuzzy variables and their numerical characteristics[J]. Fuzzy Optimization and Decision Making, 2016, 15(3): 255-279. DOI:10.1007/s10700-015-9227-3. |